Skip to content

Plan your work

Plan the work in a project

Shape a project's checklist with profile questions, move each action through its statuses with owners, dates and evidence, and ask a colleague to review it.

On this page

Profile questions

The checklist comes from the project's profile. Setup asks three questions: Select the kind of project, Select the information it works with and Select what it includes. You can pick several answers for each, and Not sure keeps the guidance broad.

Later, Refine your checklist on the project overview offers optional questions about your goal, who will use the system, how people reach it and its current stage. Each says how many actions it could add before you save it. Use Update profile on the checklist to change earlier answers; grcHero previews what changes before you save.

Note: When grcHero publishes updated guidance, the overview shows Updated guidance is available. Select Review changes to see the difference before you adopt it. Your project never changes on its own.

Action statuses

Open Add a note, owner or due date under the status to fill in the Note, Owner and Due date. Select Save progress, or Mark done when the action is finished. Progress counts only the actions that apply.

StatusMeaning
Not startedNobody has taken it on yet
PlannedSomeone has taken it on; needs an owner and a due date
In progressWork has started
DoneFinished; shown as self-reported until reviewed
Not applicableDoes not apply to this system; needs a reason in the note

Link evidence and controls

  1. Add evidence

    Under Evidence, select Add evidence to record proof as a file or a link. What to attach suggests what good evidence looks like. The evidence is a workspace record linked to the action, not a copy.

  2. Link a control

    Under Controls, choose a workspace control in Control to link and select Link. A link says which control carries out the action. It never marks the action done or approves the control.

Note: Linking a control needs permission to edit projects and to read controls. People who cannot read controls see only how many are linked.

Ask for an independent review

A done action with linked evidence can be reviewed by someone other than the person who marked it done. The reviewer opens the action, adds an optional Review note and selects Mark reviewed. The action then reads Done · reviewed.

Reviewers, compliance managers, admins and owners can review. A review never changes the status, and any later change to the status or its evidence clears it.

Hand an action to your own AI agent

Do it with your AI agent on an action gives you a prompt to copy into an AI tool you already use. Paste its answer back under Bring back the answer and save it as evidence; it is marked as an agent report, not reviewed, and the status stays as it was. An agent connected through the CLI proposes updates instead, which you accept or dismiss on the action. See AI assistant and agents.

Archive and restore

To put a finished or paused project away, select Edit project and then Archive. Archived projects stay readable but cannot change. Select Restore on an archived project to work on it again.

Anyone who can edit projects (contributor, compliance manager, admin or owner) can archive and restore. Only an owner can delete a project, and only an archived one with no recorded work or history: use Check deletion to see whether that is possible.

grcHero Workspace guides. People decide; grcHero keeps the record.