Record a change
Document a release or change: what goes out and where, who approved it, how it went and which issues it caused.
On this page
Write the change record
Open Changes from the Operations hub and choose New change. Fill in the title, type, path, risk and What changes and why, then the release details, How it was tested, How to roll it back, who is told, links and Carried out by. Choose Save draft.
grcHero does not connect to your code or pipelines. Links you add are shown, never fetched.
Note: Contributors and above write change records. Reviewers, compliance managers, admins and owners approve and close them.
Choose the path
| Path | What happens |
|---|---|
| Planned (approved before it happens) | Submit it for approval. It can be carried out only once approved. |
| Emergency (done first, approved after) | Record how it went straight away. Approvals are due within 3 days, and it shows as Approval overdue after that. |
Get it approved
Choose Submit for approval. A medium or high risk change needs a rollback plan first. Approvers choose Approve or Reject; the approver cannot be the person who asked for the change or the person carrying it out.
Low and medium risk changes need one approval. High risk changes need two, from different people. Every approval is tied to the version that was reviewed: Edit returns the record to draft and earlier approvals stop counting.
Note: If only one person in the workspace could approve, they may, and the record shows it was approved by the person concerned.
Record how it went and any issues
The owner or requester chooses Record how it went: start, end, outcome (went as planned, done with issues, rolled back or failed) and notes.
While the record is open, anyone who can write changes can Add issue: what happened, impact, when and how it was resolved. Any outcome other than went as planned needs at least one issue before closing.
Close or cancel
An approver who is not the owner chooses Close record and writes the review after the change. An emergency change needs its approvals first. The closed record is added to Evidence.
Before it is carried out, the requester or an approver can Cancel change with a reason. Closed, rejected and cancelled records are locked.