Manage risk
Record controls and test them
Record your safeguards, track framework versions, plan and record control tests, and turn a failed test into corrective work.
On this page
Add a control
Open Controls & frameworks and stay on the Controls tab. Select Add control and fill in a Control code such as AC-01, a Title and a Description, then select Create control. Adding controls needs Controls write access: contributors, compliance managers, admins and owners.
Each control card shows its description, Control testing, Supporting evidence, whether an owner is assigned, and any exception that covers it. Inside a project, Link existing adds a workspace control to the project without copying it.
Track a framework
On the Frameworks tab, select Add framework, choose a Framework track and select Track framework. This needs Frameworks write access, which compliance managers, admins and owners hold. Each track has a fixed version and a link to its publisher.
Tracking a framework records your interest in it. It does not import licensed requirement text and does not claim audit readiness.
| Track | Version |
|---|---|
| CIS Controls | 8.1 |
| NIST CSF | 2.0 |
| ISO/IEC 27001 | 2022 |
| SOC 2 | 2017 TSC / 2022 PoF |
Map controls to requirements
Requirements and mappings are managed through the API today; the CLI can list them with grchero framework requirements. Someone with Frameworks write access adds the requirements you work to, in your own words, under a tracked framework.
A mapping links a control to a requirement with a note on where the link comes from and a confidence from 1 to 5. It starts as a proposal. Someone other than the person who proposed it, holding Controls review (reviewers, compliance managers, admins and owners), approves or rejects it once, with a note. To change a decided mapping, remove it and propose it again.
Test a control
Expand Control testing on a control card. Setting up and recording tests needs Controls write access; reviewing a result needs Controls review.
Set up testing
Choose a Test type (Operating effectiveness or Control design), describe the Procedure, pick a Testing owner and optionally an Independent reviewer, then set Repeat every (days) and Next test due. Select Save plan.
Record test
Enter the Period start and Period end, the Sample and work performed, a Result (Pass, Fail or Inconclusive) and the Conclusion and limitations. Tick the Evidence for this period. A pass or fail needs evidence; without proof, record the result as inconclusive.
Review the result
Another member selects Review result and chooses Accept recorded result and proof for this test or Request changes, with a Review rationale. The testing owner and the person who ran the test cannot review their own result, and nobody can accept evidence they uploaded.
Note: An accepted failure stays a failure. Only an accepted pass against an unchanged plan moves the next due date forward. A design test says nothing about how the control operates over time.
Fix a failed test
On a failed or inconclusive result, select Create corrective finding. You set the severity, the remediation owner, a due date and an explanation. The finding then follows the normal finding workflow.
To close the loop, record a newer test of the same plan and link it to the corrective finding. The fix can be submitted and approved only when the latest linked retest is an accepted pass with current proof. A test never closes a finding or creates a business risk by itself.
Evidence on a control
Supporting evidence on a control card lists the proof linked to it, and says whether each item was reviewed for a fix or needs a fresh review. Evidence reaches a control when a reviewer approves a finding's fix, when a control test is accepted, or when someone links it with grchero evidence link or grchero evidence add --control. See Add evidence from CI.
Use Request evidence on Control testing to ask a colleague for proof. Linked evidence supports the control; it does not establish the control's overall effectiveness.